Emergency delivery of 1300 tons connector for SW Trans- Russia (incl. video)

SW-Trans recently has posted some reactors and used cranes from Terex. These cranes are equipped with the lifting blocks supplied by De Haan: SWL 1600 tons and SWL 600 tons.


De Haan has delivered these blocks in an emergency delivery and took care for both the design and delivery of a 1,300 tons SWL special connector for the connection between the central eye of the 1600 tons lifting block and the lifting eye on the reactor. This connector is designed and made within 3 weeks and has a weight of 5500 kg.

 

I